Project Engineer - Epoxy and Coating Works
Job Description and Requirements
Project Engineer - Epoxy and Coating WorksJob Snapshot
Role: Project Engineer - Epoxy and Coating Works
Location: Dubai, United Arab Emirates
Industry: Construction
Function: Project Management
Experience: High-rise construction experience required
Job Type: Full-time
Position Overview
Project Engineer - Epoxy and Coating Works in Dubai, United Arab Emirates is a specialized Construction opportunity with Azizi Developments for an experienced civil or materials engineering professional responsible for epoxy flooring, resinous systems, painting, and protective coating works across high-rise projects. The role manages application sequencing, surface preparation, material logistics, manpower allocation, environmental controls, quality compliance, and multidisciplinary site coordination to ensure every coating layer is applied correctly and completed within project schedules.
Job Details
Country: United Arab Emirates
City: Dubai
Industry: Construction
Function: Project Management
Salary: 14000-22000
Estimated salary range based on similar jobs in the job city; please confirm the final offer with the employer.
Gender: Any
Candidate
Job Type: Full-time
Role Context
The Project Engineer - Epoxy and Coating Works will take technical and operational ownership of specialized flooring and coating packages from preparation through final inspection. The position requires detailed knowledge of resinous flooring systems, epoxy chemistry, substrate preparation, curing requirements, environmental conditions, and multi-layer application sequences.
Working across high-rise construction environments, the engineer will coordinate coating activities with surrounding civil, architectural, MEP, and finishing trades while ensuring materials, manpower, work fronts, and inspection requirements are available at the correct stage. Accurate planning and quality control will be essential to preventing coating failures, rework, sequencing delays, and premature deterioration.
Key Responsibilities
* Plan and sequence epoxy flooring, resinous coating, painting, and specialized surface treatment activities across assigned project areas.
* Develop practical installation schedules for primers, intermediate coats, body coats, toppings, protective finishes, and final applications.
* Coordinate coating works with civil, architectural, MEP, fit-out, and finishing activities to prevent access conflicts and rework.
* Inspect substrates before application and ensure surfaces meet specified preparation requirements.
* Oversee grinding, cleaning, moisture control, repair, profiling, and other surface preparation processes.
* Verify substrate condition before release for epoxy, resinous flooring, or painting works.
* Monitor environmental conditions including temperature, humidity, ventilation, and moisture levels throughout application and curing cycles.
* Ensure coating materials are mixed, applied, and cured according to manufacturer recommendations and approved technical procedures.
* Coordinate procurement timing and delivery requirements for epoxy, paint, primers, hardeners, aggregates, sealers, and related materials.
* Monitor storage conditions to protect temperature-sensitive and chemically reactive products.
* Manage site distribution of coating materials while maintaining traceability and minimizing wastage.
* Review technical data sheets, material approvals, method statements, specifications, and application procedures.
* Monitor application thickness, coverage, finish quality, curing intervals, and compliance with approved systems.
* Coordinate inspections with QA/QC teams and ensure work is ready before formal inspection requests are raised.
* Identify coating defects including delamination, blistering, pinholes, cracking, uneven finish, poor adhesion, contamination, or insufficient thickness.
* Coordinate corrective measures and verify satisfactory rectification of non-conforming work.
* Allocate manpower, applicators, supervisors, equipment, and materials across concurrent work fronts.
* Monitor productivity and adjust resources where necessary to protect project milestones.
* Liaise with HSE teams regarding ventilation, chemical handling, personal protective equipment, flammable materials, and safe application practices.
* Resolve sequencing problems and technical constraints affecting specialized coating activities.
* Maintain daily progress reports, inspection records, material consumption logs, and productivity information.
* Track material usage against planned quantities and identify unusual consumption or wastage.
* Coordinate with site management regarding work-front readiness, access, protection, and handover requirements.
* Support snagging, corrective works, final inspection, and handover of completed coating and flooring packages.
Ideal Profile
Bachelor\'s Degree in Civil Engineering, Materials Science, Construction Management, or a closely related discipline.
Proven experience delivering painting, epoxy flooring, resinous flooring, and specialized coating packages within construction environments is essential.
Candidates should have direct experience working on high-rise building projects in the UAE.
Strong practical understanding of resinous flooring systems, epoxy chemistry, surface preparation, substrate conditions, primers, curing requirements, application thicknesses, and multi-layer coating sequences is required.
The successful candidate should be capable of planning multiple coating work fronts while coordinating manpower, materials, access, inspections, and surrounding construction activities.
Experience monitoring temperature, humidity, ventilation, moisture, and other environmental factors affecting coating performance is important.
Hands-on exposure to quality inspections, technical specifications, method statements, material data sheets, application procedures, and defect rectification is expected.
The position suits an engineer who combines technical coating expertise with strong construction planning, site coordination, quality control, and resource management skills.
Skills Set
Epoxy flooring
Resinous flooring systems
Specialized coatings
Painting works
Protective coatings
Epoxy chemistry
Multi-layer coating systems
Surface preparation
Concrete substrate preparation
Surface grinding
Moisture testing
Primer application
Coating thickness control
Material mixing
Curing management
Environmental monitoring
Temperature control
Humidity monitoring
Ventilation requirements
Material logistics
Material storage
Material consumption control
Construction scheduling
Sequence planning
Resource allocation
Manpower planning
Site supervision
Quality control
QA/QC coordination
Inspection reports
Technical specifications
Method statements
Material data sheets
Defect identification
Corrective actions
HSE coordination
Chemical handling
High-rise construction
UAE construction
Progress reporting
Snagging
Project handover
Why Join Us
Azizi Developments offers experienced construction professionals the opportunity to take ownership of technically demanding specialist packages across major high-rise, residential, hospitality, and mixed-use developments in Dubai. This role provides focused exposure to advanced flooring systems, epoxy technologies, specialized coatings, technical quality control, material management, and complex construction sequencing.
The continued expansion of Azizi Developments\' project portfolio creates strong demand for engineers capable of delivering durable, high-quality finishes while maintaining schedule, safety, and performance standards across challenging Construction environments.
About the Company
Azizi Developments is a leading Dubai-based real estate developer delivering residential, hospitality, commercial, and mixed-use projects across the United Arab Emirates. Its portfolio includes landmark developments such as Burj Azizi, Monaco Mansions, and Azizi Venice, supported by an integrated construction-driven approach focused on engineering quality, technical precision, efficient execution, and long-term value creation.



